chore: update work items and daily logs with May 12 entries, including REST backend deployment and validation meeting details
This commit is contained in:
@@ -8,7 +8,7 @@ systems: [xflowsdk]
|
||||
workstreams: [rest-migration]
|
||||
people: [jeff-dewitte, bruce-meeks, adam-abdelhadi, tauf, jeffrey-oleary, aylwing-olivas]
|
||||
related: [launchdarkly, github-copilot]
|
||||
updated: 2026-05-11
|
||||
updated: 2026-05-12
|
||||
tags:
|
||||
- work-item
|
||||
- fidelity
|
||||
@@ -89,6 +89,9 @@ tags:
|
||||
- Jeff directed David to move the ticket to Done, while keeping the PR unmerged for at least 30 days.
|
||||
- Branch maintenance is now part of the work: keep the GraphQL/Apollo-removal branch up to date with `main` until the REST backend/toggle validation window allows merge. If future `main` merges create conflicts that look non-trivial, raise it so a 1-2 point maintenance story can be created.
|
||||
- May 11 preparation for another REST-layer validation meeting: Fid4 `4.32` was checked out in a separate folder, aligned to the published/internal build `Podfile.lock` from iOSInstaller, and built successfully. Current XQ1 behavior appears to have `iOS-XflowRestEnabled` already active, so Fid4 is loading REST; `Open an account` is the simplest non-authenticated XFlow entry point to use for a quick readiness test.
|
||||
- Jeff confirmed May 11 that the REST back end has now been deployed, and a meeting is scheduled for May 12 with the team lead and Bruce to toggle the flag and test both REST and non-REST states.
|
||||
- REST detection for the meeting: Charles Proxy to verify `/xflow/api` endpoints and inspect `mobile.launchdarkly.com` bulk payloads for the raw evaluated flag value.
|
||||
- Production testing: Raj is trying to get approval to test in production. A production test account will be needed; currently only Bruce is known to have one. David found a way to force the production environment from the simulator if needed.
|
||||
|
||||
---
|
||||
|
||||
|
||||
Reference in New Issue
Block a user